pm-construction
v1.0.0Construction & trades professional skills: bid/tender review, change orders, punch lists, toolbox-talk safety briefings, subcontractor scorecards, and delay claim letters — real field judgment for PMs, supers, and owners' reps.
By Mohit AggarwalLicense: MIT1.4k GitHub starsUpdated yesterday
Directory evidence
- Runtimes
- Claude Code
- Parsed components
- 6 skill or MCP entries
- Source updated
- Oct 4, 2026
- Manifest status
- Canonical path parsed
The directory validates manifest shape and source location. It does not execute the plugin or provide a security endorsement. Review the indexing methodology →
Install pm-construction for Claude Code
claude plugin marketplace add IchenDEV/agent-plugin-mkt
claude plugin marketplace update agent-plugin-marketplace
claude plugin install pm-construction@agent-plugin-marketplacePaste and run these commands in a terminal with Claude Code. They add and refresh the PluginsMP catalog, then install this plugin.
The installer fetches third-party code from the source repository shown on this page. This directory validates manifest structure and source location, but does not perform a security audit; review the manifest, components, and source before installing.
Get the source manually
git clone https://github.com/mohitagw15856/pm-claude-skillsClone the source repository, then follow its setup instructions to add the plugin to a compatible client. The plugin root is plugins/pm-construction/.
Plugin files
├── .claude-plugin/plugin.json├── skills/bid-tender-review/SKILL.md├── skills/change-order-writer/SKILL.md├── skills/delay-claim-letter/SKILL.md├── skills/punch-list-builder/SKILL.md├── skills/site-safety-briefing/SKILL.md└── skills/subcontractor-scorecard/SKILL.md
Included Skills6
Analyse a construction bid or tender package for scope gaps, risk-shifting exclusions, unit-rate red flags, and front-loading in the schedule of values. Use when asked to review a bid, level bids, check a tender for gaps, compare sub quotes, or vet a schedule of values before award. Produces a structured bid review with a gap register, exclusion risk table, pricing red flags, and an award recommendation with pre-award clarifications.
Draft a defensible construction change order with entitlement basis, scope delta, itemised pricing, and schedule impact. Use when asked to write a change order, price extra work, draft a CO or COR/PCO, respond to a directive for changed work, or paper a field change. Produces a complete change order request with contract-clause entitlement, labour/material/equipment/OH&P breakdown, time impact statement, and reservation of rights.
Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.
Turn walkthrough notes, photos, or voice-memo transcripts into a proper construction punch list with location, trade, and spec reference per item. Use when asked to build a punch list, clean up walkthrough notes, organise a deficiency list, prep for substantial completion, or track punch items to closeout. Produces a numbered punch list grouped by location with severity tiers, responsible subcontractor, back-charge candidates, and closeout/retainage linkage.
Produce a toolbox talk or pre-task safety briefing from the day's planned construction work. Use when asked to write a toolbox talk, prepare a pre-task plan or JHA/JSA briefing, brief a crew on today's hazards, or plan safety for a specific task like a crane pick, excavation, or hot work. Produces a crew-ready briefing with task-specific hazards, controls ordered by the hierarchy of controls, required permits, and explicit stop-work triggers.
Score a subcontractor's performance across schedule reliability, quality, safety, paperwork, and change-order behaviour with weighted anchors. Use when asked to evaluate a sub, build a subcontractor scorecard, decide whether to rebid or rehire a trade, review sub performance for prequalification, or justify removing a sub from the bid list. Produces a weighted scorecard with per-dimension anchored ratings, evidence notes, and an award/retention recommendation.
Plugin manifests1
{
"$schema": "https://anthropic.com/claude-code/plugin.schema.json",
"name": "pm-construction",
"version": "1.0.0",
"description": "Construction & trades professional skills: bid/tender review, change orders, punch lists, toolbox-talk safety briefings, subcontractor scorecards, and delay claim letters — real field judgment for PMs, supers, and owners' reps.",
"author": {
"name": "Mohit Aggarwal",
"email": "[email protected]"
},
"homepage": "https://github.com/mohitagw15856/pm-claude-skills",
"license": "MIT",
"keywords": [
"construction",
"contractor",
"tender",
"change-order",
"punch-list",
"safety",
"delay-claim"
]
}For maintainers
If you maintain this plugin, link to this source-backed listing from your README so users can review its manifest and indexed components.
[pm-construction on Agent Plugins Marketplace](https://pluginsmp.com/plugins/pm-construction)